Underground Forest Berkenwoude
- Project Number:
- UGFL006
- Pathway:
- Land Stored Carbon
- Methods:
- Biomass burial
- Size:
- 0.13 ha
- Remover:
- Underground Forest
- Location:
- Berkenwoude
- Start date:
- 2025
- Certification status:
- Pre-validated
Total
133tCO2
units in circulation
for this project
for this project
Available
68tCO2
Units available for purchase, both potential and delivered
Holding
27tCO2
Land Stored Carbon
Carbon calculation
The calculation behind this project's ledger, published as a document (updated 11 Feb 2026). It is shown exactly as published.
Source: Carbon Calculation UGF006.pdf - the published calculation is the underlying evidence for the Ledger figures. It is shown as published, without reformatting. More files are on the Documents tab.