Bamboo - Kibale 2
- Project Number:
- BVUL003
- Pathway:
- Land Stored Carbon
- Methods:
- Bamboo farms
- Size:
- 54.87 ha
- Remover:
- Bamboo 4 All the World
- Location:
- Kibale
- Start date:
- 2025
Total
24169tCO2for this project
Available
19335tCO2Holding
4834tCO2Carbon calculation
The calculation behind this project's ledger, shown exactly as published in its calculation sheet (updated 13 Mar 2026).
Projected storage in bamboo field
storage potential per ha x area x storage duration 100 year equivalent
Project emissions
LCA estimate
Net storage potential
project storage -/- emissions over 20 years
Potential units issued
of 24,169 units first 12 years, 4,834 kept back in the holding pool
General information
Remover name
Project code
Project name
Location
Area
Start year
year of planting
Duration
project duration
Permanence
Holding pool
freed up when measurements confirm projection pathways
Project emissions
LCA estimate
Per hectare
Baseline TEC
Soil Organic Carbon and Above Ground Carbon, following CDM AR-ACM0003
Reference capacity
Using CEDA and Soil sample data
Storage potential
Projection -/- baseline
Per project
Projected storage in bamboo field
storage potential per ha x area x storage duration 100 year equivalent
Storage in fence
Storage in fruit trees
LCA emissions
project related emissions
Net storage potential
project storage -/- emissions over 20 years
Potential Carbon Removal Units
Units first 12 years
12/20 x net storage potential
Holding Pool
20% of the first 12 years
Potential units issued
Source: Carbon Credit Calculation - BVUL003 _V3 - the published calculation is the underlying evidence for the Ledger figures. Values are shown as published, without reformatting.