Bamboo Jochem van der Lugt
- Project Number:
- BBLL023
- Pathway:
- Land Stored Carbon
- Methods:
- Bamboo farms
- Size:
- 1.5 ha
- Remover:
- Bamboologic
- Location:
- Heienoord
- Start date:
- 2024
Total
134tCO2units in circulation
for this project
for this project
Available
97tCO2Units available for purchase, both concept and delivered
Holding
27tCO2Land Stored Carbon
Loading documents…