Hofkerk Wolfheze
- Project Number:
- KAR-C-001
- Pathway:
- Construction Stored Carbon
- Methods:
- Biobased building
- Size:
- 226 m³
- Remover:
- Karbouw
- Location:
- Johan Stratiuslaan 20 en 22 Marcharislaan 13 en 15, 6874AM Wolfheze Netherlands .
- Start date:
- 2022
- Certification status:
- Pre-validated
Total
144tCO2
units in circulation
for this project
for this project
Available
137tCO2
Units available for purchase, both potential and delivered
Holding
7tCO2
Construction Stored Carbon
Carbon calculation
The calculation behind this project's ledger, shown exactly as published in its calculation sheet (updated 26 Dec 2025).
Total Construction Stored Carbon
170.53tCO2e
Net Carbon Removal Benefit
144t CO2e
the project's net removal after deductions, as published by the tool
Project details
Adress
Jogan Stratiuslaan 20 & 22 , 6874 AM Wolfheze, Netherlands
Project type
Residential: slanted roof
Expected realisation year
2023
Project lifespan
100years
Gross floor area
826m2
Project phase
As Built
Net Carbon Removal Benefit
Total Construction Stored Carbon
170.53tCO2e
Net Carbon Removal Benefit
the project's net removal after deductions, as published by the tool
144t CO2e
Per m2 gross floor area
174.5kg CO2e / m2
Total lifespan (including reuse)
100years
Biobased products
Cross-laminated timber (X-LAM)
quantity 226,474 m3, lifespan 100 years
-170534.922kg CO2e
Source: Climate_Cleanup_NCRB_CalculationTool_v3.2_Wolfheze.xlsx (tab “Report”) - the published calculation is the underlying evidence for the Ledger figures. Values are shown as published, without reformatting.