M2205 Appelweg

Project Number:
MOOS-C-001
Pathway:
Construction Stored Carbon
Methods:
Biobased building
Size:
1160 m³
Remover:
In the Middle of Our Street B.V.
Location:
Asterweg 15B, 1031 HL Amsterdam
Start date:
2023
Certification status:
Pre-validated

Total

783tCO2
units in circulation
for this project

Available

744tCO2
Units available for purchase, both potential and delivered

Holding

39tCO2
Construction Stored Carbon

Carbon calculation

The calculation behind this project's ledger, published as a document (updated 21 Jan 2026). It is shown exactly as published.

Source: NCRB_MOOS-C-001_Appelweg.pdf - the published calculation is the underlying evidence for the Ledger figures. It is shown as published, without reformatting. More files are on the Documents tab.