M2205 Appelweg
- Project Number:
- MOOS-C-001
- Pathway:
- Construction Stored Carbon
- Methods:
- Biobased building
- Size:
- 1160 m³
- Remover:
- In the Middle of Our Street B.V.
- Location:
- Asterweg 15B, 1031 HL Amsterdam
- Start date:
- 2023
- Certification status:
- Pre-validated
Total
783tCO2
units in circulation
for this project
for this project
Available
744tCO2
Units available for purchase, both potential and delivered
Holding
39tCO2
Construction Stored Carbon
Carbon calculation
The calculation behind this project's ledger, published as a document (updated 21 Jan 2026). It is shown exactly as published.
Source: NCRB_MOOS-C-001_Appelweg.pdf - the published calculation is the underlying evidence for the Ledger figures. It is shown as published, without reformatting. More files are on the Documents tab.