Valkensteyn

Project Number:
WSR-C-001
Pathway:
Construction Stored Carbon
Methods:
Biobased building
Size:
1872 m³
Remover:
Woonstad Rotterdam
Location:
Rochussenstraat 21, 3015 EA Rotterdam, Nederland
Start date:
2023
Certification status:
Pre-validated

Total

1340tCO2
units in circulation
for this project

Available

1273tCO2
Units available for purchase, both potential and delivered

Holding

67tCO2
Construction Stored Carbon

Carbon calculation

The calculation behind this project's ledger, published as a document (updated 30 Mar 2026). It is shown exactly as published.

Source: NCRB_WSR-C-001_Valkensteyn.pdf - the published calculation is the underlying evidence for the Ledger figures. It is shown as published, without reformatting. More files are on the Documents tab.