Xylino

Project Number:
ALI-C-001
Pathway:
Construction Stored Carbon
Methods:
Biobased building
Size:
1 m³
Remover:
De Alliantie
Location:
Agamemnonsingel 1 t/m 158, 1363VH Almere · NL
Start date:
2025
Certification status:
Pre-validated

Total

2 159,1tCO2
units in circulation
for this project

Available

2 051,1tCO2
Units available for purchase, not yet verified

Holding

108tCO2
Construction Stored Carbon

Carbon calculation

The calculation behind this project's ledger, published as a document (updated 26 Aug 2026). It is shown exactly as published.

Source: NCRB_new_ALI-C-001.pdf - the published calculation is the underlying evidence for the Ledger figures. It is shown as published, without reformatting. More files are on the Documents tab.