't Rozen Paulownia

Project Number:
PTR-L-001
Pathway:
Land Stored Carbon
Methods:
Paulownia
Size:
2.54 ha
Remover:
E.G.A. Rouweler en W.J.M. Rouweler-Hekking
Location:
Raalte
Start date:
2025

Total

548tCO2
units in circulation
for this project

Available

438tCO2
Units available for purchase, both concept and delivered

Holding

110tCO2
Land Stored Carbon