Vienna Green Hub

Project Number:
EPO-C-001
Pathway:
Construction Stored Carbon
Methods:
Biobased building
Size:
405 m³
Remover:
European Patent Office
Location:
Rennweg ONr. 12, 1030 Wien.
Start date:
2023
Certification status:
Pre-validated

Total

349tCO2
units in circulation
for this project

Available

332tCO2
Units available for purchase, both potential and delivered

Holding

17tCO2
Construction Stored Carbon

Carbon calculation

The calculation behind this project's ledger, published as a document (updated 24 Aug 2026). It is shown exactly as published.

Source: NCRB_Green_Hub_ARQ-C-001.pdf - the published calculation is the underlying evidence for the Ledger figures. It is shown as published, without reformatting. More files are on the Documents tab.