Tuinderij de Veldhof

Project Number:
TDV-L-001
Pathway:
Land Stored Carbon
Methods:
Regenerative farming
Size:
1.61 ha
Remover:
Stichting Levende Grond
Location:
Joppe
Start date:
2026
Certification status:
Pre-validated

Total

146tCO2
units in circulation
for this project

Available

117tCO2
Units available for purchase, both potential and delivered

Holding

29tCO2
Land Stored Carbon

Carbon calculation

The calculation behind this project's ledger, shown exactly as published in its calculation sheet (updated 10 Sep 2026).

Projected storage

303tCO2

storage potential per ha x area

LCA emissions

61tCO2

project related emissions

Net storage potential

243tCO2

project storage -/- emissions over 20 years

Potential units issued

117units

of 146 units first 12 years, 29 kept back in the holding pool

General information

Remover name

Stichting Levende Grond

Project code

TDV-L-001

Project name

Tuinderij de Veldhof

Location

Joppe, The Netherlands

Area

1.61ha

Starting year

year of planting

2026.00

Duration

project duration

20years

Holding pool

freed up when measurements confirm projection pathways

20%

Project emissions

LCA estimate, or specified when >20%

20%

Per hectare

Baseline TEC

Soil Organic Carbon and Above Ground Carbon, following CDM AR-ACM0003

354tCO2/ha

Reference capacity

Using CEDA and Soil sample data

542tCO2/ha

Storage potential

Projection -/- baseline

188tCO2/ha

Per project

Projected storage

storage potential per ha x area

303tCO2

LCA emissions

project related emissions

61tCO2

Net storage potential

project storage -/- emissions over 20 years

243tCO2

Potential Carbon Removal Units

Units first 12 years

12/20 x net storage potential

146units

Holding Pool

20% of the first 12 years

29units

Potential units issued

117units

Source: Carbon Credit Calculation - TDV-L-001.xlsx - the published calculation is the underlying evidence for the Ledger figures. Values are shown as published, without reformatting.