EDGE Coolsingel

Project Number:
EDGE-C-001
Pathway:
Construction Stored Carbon
Methods:
Biobased building
Size:
2 417 m³
Remover:
EDGE
Location:
Coolsingel 75, 3012AD Rotterdam · NL
Start date:
2024
Certification status:
Pre-validated

Total

1 588tCO2
units in circulation
for this project

Available

1 509tCO2
Units available for purchase, not yet verified

Holding

79tCO2
Construction Stored Carbon

Carbon calculation

The calculation behind this project's ledger, published as a document (updated 30 Oct 2026). It is shown exactly as published.

Source: NCRB_EDGE-C-001.pdf - the published calculation is the underlying evidence for the Ledger figures. It is shown as published, without reformatting. More files are on the Documents tab.