Bamboo Village Uganda
- Project Number:
- BVU-L-001
- Pathway:
- Land Stored Carbon
- Methods:
- Bamboo farms
- Size:
- 10 ha
- Remover:
- Bamboo Village Uganda
- Location:
- Kiboga Ntwetwe, Uganda
- Start date:
- 2023
Total
2863tCO2for this project
Available
2165tCO2Holding
573tCO2Carbon calculation
The calculation behind this project's ledger, shown exactly as published in its calculation sheet (updated 15 Mar 2026).
Projected storage
storage potential per ha x area
LCA emissions
project related emissions
Net storage potential
project storage -/- emissions over 20 years
Credits issued dd
of 2.863 credits first 12 years, 573 kept back in the holding pool
General information
Project code
Project name
Location
Area
Duration
estimated permanence of removal and storage (converted to 100)
Holding pool
freed up when measurements confirm projection pathways
Project emissions
Life cycle assessed emissions over 20 years
Out of scope
Certificates for harvest to be modeled and issued separately
Per hectare
Baseline TEC
Above Ground, Below Ground and Soil Organic Carbon, following CDM AR-ACM0003
Reference capacity
INBAR (2018), range confirmed from Abebe et al (2021) and others
Storage potential
Projection -/- baseline
Per project
Projected storage
storage potential per ha x area
LCA emissions
project related emissions
Net storage potential
project storage -/- emissions over 20 years
Removal credits issued
Credits first 12 years
12/20 x net storage potential x permanence factor (duration / 100)
Holding Pool
20% of the first 12 years
Credits issued dd
80% of the first 12 years
Source: Carbon Credit Calculation BVU-L-001 - the published calculation is the underlying evidence for the Ledger figures. Values are shown as published, without reformatting.