Bamboo Jelle de With

Project Number:
BBLL018
Pathway:
Land Stored Carbon
Methods:
Bamboo farms
Size:
2.12 ha
Remover:
Bamboologic
Location:
Zeijen, The Netherlands
Start date:
2024

Total

97tCO2
units in circulation
for this project

Available

0tCO2
Units available for purchase, both concept and delivered

Holding

19tCO2
Land Stored Carbon

Carbon calculation

The calculation behind this project's ledger, shown exactly as published in its calculation sheet (updated 17 Dec 2024).

Projected storage

203tCO2

storage potential per ha x area

LCA emissions

41tCO2

project related emissions

Net storage potential

162tCO2

project storage -/- emissions over 20 years

Credits issued

78credits

of 97 credits first 12 years, 19 kept back in the holding pool

General information

Remover name

Bamboologic

Project code

BBL-018

Project name

Jelle De With

Location

Donderen, Netherlands

Area

2.12ha

Duration

estimated permanence of removal and storage

20years

Holding pool

freed up when measurements confirm projection pathways

20%

Project emissions

LCA estimate, or specified when >20%

20%

Per hectare

Baseline TEC

Soil Organic Carbon and Below and Above Ground Biomass

520tCO2/ha

Reference capacity

Using CEDA and Soil sample data

616tCO2/ha

Storage potential

Projection -/- baseline

96tCO2/ha

Per project

Projected storage

storage potential per ha x area

203tCO2

LCA emissions

project related emissions

41tCO2

Net storage potential

project storage -/- emissions over 20 years

162tCO2

Removal credits issued

Credits first 12 years

12/20 x net storage potential

97credits

Holding Pool

20% of the first 12 years

19credits

Credits issued

78credits

Source: Carbon Calculation - BBL-L-018 - the published calculation is the underlying evidence for the Ledger figures. Values are shown as published, without reformatting.