Finti Timber
- Project Number:
- FINTI-C-001
- Pathway:
- Construction Stored Carbon
- Methods:
- Biobased product
- Size:
- 2316 m³
- Remover:
- Finti
- Location:
- Bouwstraat 8, 7483 PA, Haaksbergen
- Start date:
- 2024
- Certification status:
- Pre-validated
Total
1821tCO2
units in circulation
for this project
for this project
Available
1724tCO2
Units available for purchase, both potential and delivered
Holding
91tCO2
Construction Stored Carbon
Carbon calculation
The calculation behind this project's ledger, published as a document (updated 25 Feb 2026). It is shown exactly as published.
Source: Finti-output-2024.pdf - the published calculation is the underlying evidence for the Ledger figures. It is shown as published, without reformatting. More files are on the Documents tab.