Voedsel Notenbos Drimmelen
- Project Number:
- DMLL001
- Pathway:
- Land Stored Carbon
- Methods:
- Food forest
- Size:
- 1.1 ha
- Remover:
- Stichting de AmerkantOp
- Location:
- Drimmelen
- Start date:
- 2024
- Certification status:
- Pre-validated
Total
184tCO2for this project
Available
147tCO2Holding
37tCO2Carbon calculation
The calculation behind this project's ledger, shown exactly as published in its calculation sheet (updated 16 Mar 2026).
Projected storage
storage potential per ha x area x storage duration 100 year equivalent
LCA emissions
project related emissions
Net storage potential
project storage -/- emissions over 20 years
Potential units issued
of 184 units first 12 years, 37 kept back in the holding pool
General information
Project name
Remover name
Project code
Location
Area
Start year
Duration
project duration
Holding pool
freed up when measurements confirm projection pathways
Project emissions
LCA estimate, or specified when >20%
Per hectare
Baseline TEC
Soil Organic Carbon and Above Ground Carbon, following CDM AR-ACM0003
Reference capacity
Using CEDA and Soil sample data
Storage potential
Projection -/- baseline
Per project
Projected storage
storage potential per ha x area x storage duration 100 year equivalent
LCA emissions
project related emissions
Net storage potential
project storage -/- emissions over 20 years
Potential Carbon Removal Units
Units first 12 years
12/20 x net storage potential
Holding Pool
20% of the first 12 years
Potential units issued
Source: Carbon_Calculation-DMLL001 - the published calculation is the underlying evidence for the Ledger figures. Values are shown as published, without reformatting.