Bamboo Mark Oprins 1
- Project Number:
- BBL-L-008
- Pathway:
- Land Stored Carbon
- Methods:
- Bamboo farms
- Size:
- 1 ha
- Remover:
- Bamboologic
- Location:
- Merksplas, BE
- Start date:
- 2024
Total
206tCO2for this project
Available
115tCO2Holding
41tCO2Carbon calculation
The calculation behind this project's ledger, shown exactly as published in its calculation sheet (updated 25 Mar 2024).
Projected storage
storage potential per ha x area
LCA emissions
project related emissions
Net storage potential
project storage -/- emissions over 20 years
Ex ante credits issued
41 kept back in the holding pool
General information
Remover name
Project code
Project name
Location
Area
Duration
estimated permanence of removal and storage
Holding pool
freed up when measurements confirm projection pathways
Project emissions
LCA estimate, or specified when >20%
Out of scope
Certificates to be modeled and issued separately
Per hectare
Baseline TEC
Above Ground, Below Ground and Soil Organic Carbon, following CDM AR-ACM0003
Reference capacity
Using CEDA and Soil sample data
Storage potential
Projection -/- baseline
Per project
Projected storage
storage potential per ha x area
LCA emissions
project related emissions
Net storage potential
project storage -/- emissions over 20 years
Removal credits issued
Credits 20 years
duration/20 x net storage potential
Holding Pool
20% of the first 20 years
Ex ante credits issued
Source: Carbon Calculation BBL-L-008 - the published calculation is the underlying evidence for the Ledger figures. Values are shown as published, without reformatting.