Akkerbouwbedrijf Kaput 2023

Project Number:
AKBL003
Pathway:
Land Stored Carbon
Methods:
Regenerative farming
Size:
46.96 ha
Remover:
Akkerbouwbedrijf Kaput
Location:
Bellingwolde
Start date:
2023

Total

2165tCO2
units in circulation
for this project

Available

1640tCO2
Units available for purchase, both concept and delivered

Holding

433tCO2
Land Stored Carbon

18 photos · 2023 – 2026