Akkerbouwbedrijf Kaput 2024

Project Number:
AKBL004
Pathway:
Land Stored Carbon
Methods:
Regenerative farming
Size:
18.123 ha
Remover:
Akkerbouwbedrijf Kaput
Location:
Bellingwolde
Start date:
2024

Total

771tCO2
units in circulation
for this project

Available

617tCO2
Units available for purchase, both concept and delivered

Holding

154tCO2
Land Stored Carbon
Loading documents…