Akkerbouwbedrijf Kaput 2024
- Project Number:
- AKBL004
- Pathway:
- Land Stored Carbon
- Methods:
- Regenerative farming
- Size:
- 18.123 ha
- Remover:
- Akkerbouwbedrijf Kaput
- Location:
- Bellingwolde
- Start date:
- 2024
Total
771tCO2units in circulation
for this project
for this project
Available
617tCO2Units available for purchase, both concept and delivered
Holding
154tCO2Land Stored Carbon
Loading documents…