MaMa Poppies
- Project Number:
- RJM-C-001
- Pathway:
- Construction Stored Carbon
- Methods:
- Biobased building
- Size:
- 2369 m³
- Remover:
- MaMa One II C.V.
- Location:
- Klaprozenweg 39, 1032 KN Amsterdam, The Netherlands
- Start date:
- 2023
- Certification status:
- Pre-validated
Total
1826tCO2
units in circulation
for this project
for this project
Available
1735tCO2
Units available for purchase, both potential and delivered
Holding
91tCO2
Construction Stored Carbon
Carbon calculation
The calculation behind this project's ledger, published as a document (updated 19 Mar 2026). It is shown exactly as published.
Source: Mama_poppies_Oncra_calculation.pdf - the published calculation is the underlying evidence for the Ledger figures. It is shown as published, without reformatting. More files are on the Documents tab.