Paulownia Schrama

Project Number:
ESPL001
Pathway:
Land Stored Carbon
Methods:
Paulownia
Size:
1.78 ha
Remover:
Fruitteelt EHM Schrama
Location:
Sterksel
Start date:
2024
Certification status:
Pre-validated

Total

114tCO2
units in circulation
for this project

Available

91tCO2
Units available for purchase, both potential and delivered

Holding

23tCO2
Land Stored Carbon