Romeynshof

Project Number:
AM-C-001
Pathway:
Construction Stored Carbon
Methods:
Biobased building
Size:
5 915 m³
Remover:
AM
Location:
Romeynshof, 3068 JL Rotterdam · NL
Start date:
2026
Certification status:
Pre-validated

Total

4 264tCO2
units in circulation
for this project

Available

4 051tCO2
Units available for purchase, not yet verified

Holding

213tCO2
Construction Stored Carbon

Carbon calculation

The calculation behind this project's ledger, published as a document (updated 19 Mar 2026). It is shown exactly as published.

Source: NCRB_AM-C-001_in design.pdf - the published calculation is the underlying evidence for the Ledger figures. It is shown as published, without reformatting. More files are on the Documents tab.