Lidl Capelle aan den IJssel

Project Number:
LIDL-C-001
Pathway:
Construction Stored Carbon
Methods:
Biobased building
Size:
345 m³
Remover:
Lidl Nederland GbmH
Location:
Capelle aan den IJssel, Schermerhoek 509-513.
Start date:
2025
Certification status:
Pre-validated

Total

261tCO2
units in circulation
for this project

Available

248tCO2
Units available for purchase, both potential and delivered

Holding

13tCO2
Construction Stored Carbon

Carbon calculation

The calculation behind this project's ledger, published as a document (updated 21 May 2026). It is shown exactly as published.

Source: NCRB_LIDL-C-001.pdf - the published calculation is the underlying evidence for the Ledger figures. It is shown as published, without reformatting. More files are on the Documents tab.