Paulownia de Boer–Talsma

Project Number:
FBT-L-001
Pathway:
Land Stored Carbon
Methods:
Regenerative farming
Size:
2.22 ha
Remover:
Maatschap de Boer – Talsma
Location:
Stiens
Start date:
2025
Certification status:
Pre-validated

Total

262tCO2
units in circulation
for this project

Available

210tCO2
Units available for purchase, both potential and delivered

Holding

52tCO2
Land Stored Carbon
Date
Type
Vintage
From
To
Holding
Potential
Delivered
Available
Trading
(Pre)Purchased ¹
Retired ²
ID

2026-06-09

Draft

2026-06-09

Potential
+52
+210
+210

Project Totals:

52
210
0
210
0
0
0