Akkerbouwbedrijf Kaput 2022

Project Number:
AKBL002
Pathway:
Land Stored Carbon
Methods:
Regenerative farming
Size:
72.02 ha
Remover:
Akkerbouwbedrijf Kaput
Location:
Bellingwolde
Start date:
2022
Certification status:
Pre-validated

Total

2340tCO2
units in circulation
for this project

Available

1872tCO2
Units available for purchase, both potential and delivered

Holding

468tCO2
Land Stored Carbon

Carbon calculation

The calculation behind this project's ledger, shown exactly as published in its calculation sheet (updated 15 Mar 2026).

Projected storage

4,875tCO2

storage potential per ha x area

LCA emissions

975tCO2

project related emissions

Net storage potential

3,900tCO2

project storage -/- emissions over 20 years

Potential units issued

1,872units

of 2,340 units first 12 years, 468 kept back in the holding pool

General information

Remover name

Gerko Kaput - Akkerbouwbedrijf Kaput

Project code

AKBL002

Project name

Akkerbouwbedrijf Kaput 2022

Location

Hoofdweg 6, 9695 AK Bellingwolde

Area

72.02ha

Start year

2022

Duration

project duration

20years

Holding pool

freed up when measurements confirm projection pathways

20%

Project emissions

LCA estimate, or specified when >20%

20%

Per hectare

Baseline TEC

Soil Organic Carbon and Above Ground Carbon, following CDM AR-ACM0003

387tCO2/ha

Reference capacity

Using CEDA and Soil sample data

455tCO2/ha

Storage potential

Projection -/- baseline

68tCO2/ha

Per project

Projected storage

storage potential per ha x area

4,875tCO2

LCA emissions

project related emissions

975tCO2

Net storage potential

project storage -/- emissions over 20 years

3,900tCO2

Potential Carbon Removal Units

Units first 12 years

12/20 x net storage potential

2,340units

Holding Pool

20% of the first 12 years

468units

Potential units issued

1,872units

Source: Carbon Calculation - AKBL002 - 2022 - the published calculation is the underlying evidence for the Ledger figures. Values are shown as published, without reformatting.