Akkerbouwbedrijf Kaput 2022
- Project Number:
- AKBL002
- Pathway:
- Land Stored Carbon
- Methods:
- Regenerative farming
- Size:
- 72,02 ha
- Remover:
- Akkerbouwbedrijf Kaput
- Location:
- Bellingwolde · NL
- Start date:
- 2022
- Certification status:
- Pre-validated
Total
2 340tCO2
units in circulation
for this project
for this project
Available
1 872tCO2
Units available for purchase, not yet verified
Holding
468tCO2
Land Stored Carbon
Loading documents…